Warning: hit 400 hours on my frame machine and the number freaked me out a little
I was pulling a tweaked unibody on my Chief frame machine last week and happened to glance at the hour meter. 400 hours on the machine since I got it. That number stopped me cold for a second, because I figured I maybe ran it 150 hours total in that span. Guess I was way off. It made me think about how much of that time is setup, chains, measuring, and re-pulling the same anchor point because I rushed the first one. I'm starting to wonder if I should log my pulls to see where those hours really go. For the shops running frame racks, do you track hours per job at all, or am I overthinking this?