Caught a bad mortar batch before it set on a garage job in Toledo
Was laying block for a two car garage over in Toledo and the mortar started setting up way too fast, like stiff in the board inside 20 minutes. Turns out the sand pile had gotten rained on and nobody covered it, so I dumped the whole batch and had them bring fresh bags before another block went down. Could've lost the whole first course if I'd kept going, so now I check the sand before I even fire up the mixer. How do you all handle wet sand on a job, do you dry it out or just call for a new delivery?