Hit 50 raised panel doors and finally started cutting rails and stiles in batches
I used to cut every door one at a time because I figured batching would just cause mix-ups, but after door 50 came off the table saw I compared my times and the batch runs were nearly twice as fast. How many doors do you make before you switch over to batch cutting?
Yeah I fought batching for way too long for the same reason, thought I'd end up with a pile of mismatched parts. Once I started doing runs of 15 or 20 at a time the setup time basically disappeared and my cut quality got better too since I wasn't rushing.
Anything under 10 doors and I still just do them one by one, but past that it's not even close.