Saw a stat that 40% of design briefs change scope after kickoff, so is the client the problem or is the brief?
I was reading a survey from a design ops blog last week that said 40% of projects get new scope added within two weeks of kickoff, and the average shop eats about $1,200 of unpaid rework per job. That made me wonder if the real issue is the client being clueless or our side handing them a vague one page brief and calling it done. One side says make them sign a tighter scope doc, the other says that kills the trust and the good ones walk. I've had clients add a whole extra page of stuff after I already built the home screen, and honestly I blamed them at the time. Where do you all land, is it on us to lock the brief down hard or on them to know what they want before they hire anyone?