TIL the 3/8 inch slump I thought was too wet actually poured fine on a garage slab in Toledo
Helped a guy pour a 24 by 24 garage slab in Toledo last week and the mix showed up wetter than I like, close to a 5 inch slump, and I was ready to send it back. The batch guy talked me into giving it 20 minutes and a light pass with the screed before I made any call on it. We poured it, floated it, and by the time we got the power trowel on it around hour 3 the cream came up nice and the finish was one of the cleaner ones I've had this year. I've been burned by wet loads before so I was sure this one would set slow and crust over, but it never did. I'm not saying I want soup every time, just that my gut was wrong on this one. How wet do you all let a slab get before you turn the truck around?