Why does nobody talk about wetting the subgrade before a pour?
I always figured pre-wetting the dirt was a waste of a water hose, until last Tuesday on a driveway job out in Lubbock. We poured at 2pm in 98 degree heat and the first two slabs set up so fast the edger was tearing the cream instead of smoothing it. My lead man grabbed the hose while the truck was still chuting and sprayed the base down, and the next three sections finished night and day better, no crusting, no drag marks. Cost us maybe 15 minutes and a wet shirt. Now I'm second guessing every slab I've ever done dry. Any of you wet the base even on cloudy days, or do you only bother when it's cooking out there?