Unpopular opinion: cutting a window into a container weakens it more than people here admit
I was talking to a structural welder named Dale at a job site in Tacoma last week and he said something that stuck with me. He told me a 20ft container gets most of its strength from the corrugated side walls acting like a diaphragm, and as soon as you cut a 4ft opening for a window you lose a big chunk of that unless you weld in a proper frame. I had always figured you just cut the hole, trim it out with some angle iron, and call it good. Dale said he has seen two builds where guys cut wide openings with nothing but a sawzall and a prayer, and both of them flexed enough that the doors stopped lining up within a year. Now I am torn because half the builds I see online look great with big window cutouts and zero visible bracing. So which side are you on, do you frame every opening with real steel and engineering, or do you figure these boxes are tough enough that one window does not matter? I have a 40ft High Cube sitting on my lot and I do not want to screw it up.