12
Showerthought: I built my first shed studio with a 2x4 frame and plywood.
That was five years ago in Portland, and the winter drafts were awful. Last summer I redid the walls with proper 2x6 framing and filled the cavities with rockwool. The difference in noise and heat is huge, and my electric bill dropped about $30 a month. Anyone have tips for sealing around a pre-hung door in an older build?
3 comments
Log in to join the discussion
Log In3 Comments
nancy311d ago
Totally get that upgrade path, my own backyard office started the same way. Morgan.cameron is right about foam tape on the stop, that made a big difference for me too. A good door sweep was the final piece that really locked out the drafts.
7
morgan.cameron1mo ago
Notice how many projects start with "good enough for now" and then become a real fix years later. My own garage workspace had the same path, from drafty afterthought to a properly sealed room. For your door, I had luck with adhesive-backed foam tape on the stop molding and a fresh silicone bead under the exterior trim.
4
But isn't silicone a bad idea for door trim since it can't be painted?
8