Picked between re-rolling a 6 inch stub or cutting the whole header out, and I picked wrong
Last week on a boiler job in Gary I had a 6 inch stub that was out of square by about 3/16. I could have re-rolled it or cut the whole header out and started fresh. I picked the re-roll to save time, and it cracked at the seam after two heat cycles. Should have swapped in a new piece. Anyone here ever get a re-roll to hold on a short stub, or do you just scrap it?