Update: a sweep in Omaha showed me my brush rods were costing me time
Was chatting with a guy named Dale at a supply swap in Omaha last month and he said I was losing 10 minutes per flue by not laying my rods out in order before I climb up. Tried it on my next three jobs and he was right, way less up and down on the ladder. Anyone else got a small habit like that which saved them real time?