Hot take: sealed control joints in a Phoenix parking lot outlasted the saw cut ones by a mile
Everybody on the crew swears by saw cutting and nothing else, but I watched a 12,000 sq ft lot in Phoenix over about 3 years and the sealed joints were the ones still tight while the plain saw cuts were chipping and filling with grit. The number that got me was from a public works spec sheet I pulled up online, it said sealed joints can run 30 percent longer before needing repair, and I used to think that was sales talk. I've been finishing 14 years and I always told the younger guys the saw cut alone is enough if you get the timing right. I still believe timing is most of it, but I was wrong to brush off sealing as a waste of a day. On a job in Mesa two summers ago we sealed half the lot as a test and the saw-cut half already had two spalls by the next spring. I'm not saying everybody needs to change how they bid, but writing off sealing without watching a joint for a few years seems lazy. Has anybody else tracked their own joints long enough to compare, or am I the only one doing this on my own dime?