The pour at the Riverside job in 2019 that got me off paper schedules for good
Back in 2019 I was running a 6 story pour at the Riverside Medical Center in Louisville and still tracking everything on a clipboard. The concrete truck showed up 40 minutes early while my guys were still stripping forms because I had missed a callback, and we ate a change order over it. That day I switched to shared digital schedules so every sub could see the same updates in real time. What was the one job that made you ditch the old way of doing things?