TIL the cost of rework is way higher than I ever guessed
I read a 2024 study in Construction Dive that said rework eats up roughly 2-5% of total project budgets, and after seeing a $14,000 drywall screw-up on a 40-unit apartment build last month, I finally get why my old PM always triple-checked the shop drawings, so has anyone here actually tracked their rework costs on a single job and been shocked by the final number?
Disagree with the whole premise here. Rework on most jobs is not some hidden monster eating 5% of your budget, that number sounds like a study built to sell software or consulting. A $14,000 drywall fix on a 40 unit build is annoying but you bake that into your bids as normal waste and punch list work, you don't cry about it. Good crews catch most of that stuff before it ever hits the schedule, and the jobs where rework gets out of hand usually have bad management to blame, not some unavoidable cost of doing business. Tracking it obsessively is a waste of time too, you spend ten grand in PM hours chasing a two grand fix. Fix the drawings, hire people who read them, and move on.