Shoutout to the old draftsman in Toledo who told me to dimension from one datum, I almost ignored him
Six months ago I was laying out bracket holes for a weldment and did what I always do, chained the dims off each other from left to right. An old draftsman at the shop in Toledo saw my print and said to pick one datum edge and run everything from it, and I thought that was just old school fussiness. Then our fab guy stacked up 0.030 of tolerance drift across five holes and the mating plate wouldn't drop on, and I had to redraw the whole sheet from a single corner. Took me two hours to redo and it fit dead on the bench the next morning. Now I'm second guessing every chained dim I've got on drawings from last year, so how do you all handle datum callouts when the part has no obvious flat edge to start from?