TIL coolant pressure beat runout for holding a ±.0005 bore on 17-4, and I got called wrong for it
Everyone in my shop swears the only way to hold a tight bore is to dial in your tool runout to near zero and leave it. I believed that for a long time. A few months back I was fighting a 17-4 PH job at the shop in Cleveland, a 1.250 bore with a ±.0005 tolerance, and my finish passes kept drifting a tenth or two out. I swapped holders, re-indicated, even tried a new boring bar, and nothing clicked. What finally did it was bumping coolant pressure way up and aiming a dedicated line right at the cut while I dropped my finish depth of cut to .005 per side. That combo stopped the chatter I didn't even know I had and my sizes held all afternoon. My lead guy still says the pressure thing is a crutch masking a setup problem. Maybe it is, but the parts passed and the sine bar agrees. Curious if anyone here has run high pressure with light finish cuts on stainless and seen the same, or if I'm just chasing my own tail.
Push the coolant idea further by aiming two lines, not one. On a similar 17-4 bore I ran one nozzle right at the cut and a second at the back side of the bar, and that killed the last bit of whip I had. The back side line does most of the work because it damps the bar before the cut even starts. Your lead is half right that it can hide a weak setup, but if the pressure is steady and the chips clear, that is not a crutch, that is the process. Try bumping to a .003 finish pass with the pressure held and see if it still holds size. Bet it does.