29
Spent 3 hours trying to level a load that should have taken 20 minutes
Honestly, I was on a job last week lifting steel beams for a warehouse in Detroit. The load kept shifting every time I tried to hoist it past 10 feet. Turns out the chain slings I grabbed from the bin had a twisted link that nobody caught. Took me forever to figure out why it wouldn't balance. Has anyone else had a rigging issue take way longer than it should because of something simple like bad gear?
2 comments
Log in to join the discussion
Log In2 Comments
ericjackson2d agoMost Upvoted
Bad gear will kill your whole day. Cheap chain slings aren't worth the headache.
5
gonzalez.phoenix2d ago
You ever get that sinking feeling when you know somethings wrong but cant spot it? I had a ratty wire rope sling hide a broken strand under some tape one time. Spent an hour fighting a load that kept dancing. Felt like a total moron when I finally unwrapped it and saw the damage. Little stuff like that really adds up on the clock. Makes me double check every sling now no matter how good it looks.
1