Pro tip: You can often skip the vapor barrier on wood subfloors
I always thought you had to lay plastic or felt paper down first. After doing a bunch of jobs in really dry areas without any barriers, and none failing, I changed my mind. Now I just feel the subfloor and check the air with a meter. If it's bone dry, I save the step and cost.